Improving the energy efficiency of buildings and plants
Page 6 of 12
HOUSE OF CULTURE IN LOCAL COMMUNITY IZVOR, near Paracin
Author of improvements EE: Nenad Pesic
Object: House of Culture in LC IZVOR, near Paracin
Location: LC IZVOR, near Paracin
Realization: 2014.
Postojeće stanje objekta
- Required energy for heating before reconstruction = 84,426.14 kWh / a
- Required energy for heating after reconstruction = 7261.52 kWh / a
- Annual energy savings for heating: ................. = 77,164.62 kWh / a.
- Annual energy savings for air conditioning: ........... = 70,000.00 kWh / a
- Annual profit from energy savings in heating ... = 7716.46 EUR / a
- Investment in the energy efficiency improvement ....... = 13,850.00 EUR
- Net usable area: 331.56 m2
- Implemented solution: Good insulation, replacement joinery, reheating recovery of heat from the kitchen.
- Additional investment: 4.00%
- Period of return on additional investment: 1.80 years.
Detailed description of project
- The subject of energy analysis is Pre-school institutions BAMBI in Grza, near Paracin.
- Net usable area: 760.46 m2
- The analysis of energy efficiency of the existing situation.
- Proposed measures energy rehabilitation.
- A comparative economic analysis of cost-effectiveness and return on investment in energy efficiency.
- Energy required for heating before reconstruction. = 174,871.98 kWh / a of heat
- Energy required for heating after reconstruction .. = 27593.90 kWh / a of heat
- Annual energy savings for heating: ................. = 147,278.08 kWh / a of heat
- Annual energy savings for air conditioning: ........... = 176,733.69 kWh / a of heat
- Annual earnings from energy savings: .................. = 32,400.00 EUR / a
- Investing in energy efficiency improvement:........ = 44384.00 EUR / a.
- Implemented solution: Good insulation, replacement joinery, reheating thermal pompom water-water type AK RA 250ww.
- Additional investment: 4.00%
- Period of return on additional investment: 1.34 years.
- Reduced energy consumption and CO2 emissions is 85%.
Services provided
- Displaying the current condition of the buildings, which are in very poor condition.
- Represented measures of improvement energy efficiency in facilities.
- Executed a presentation of the proposed solutions.
- An analysis of the potential energy that is obtained from energy rehabilitation measures.
- The effects of investment in the improvement and promotion of energy efficiency are explained detailed