Services

Technical control of documentation

The project for the building permit is subject to technical control. The technical control of project for the building permit may be performed by a company or other legal entity or entrepreneur who meet the requirements for technical documentation required by law and determined by the investor

Technical control of the project for the building permit shall include in particular verification of: compliance with all terms and conditions contained in the Permit, the law and other regulations, technical norms, standards and quality, as well as the mutual compatibility of all parts of the technical documentation; compliance of the project with the results of previous research (Previous work); assessment of the appropriate basis for foundation of structures; checking the validity and accuracy of technical and technological solutions and solutions for construction of structures; stability and security; Rationality of the projected material; the impact on the environment and neighboring buildings.

About completed technical inspection report shall be prepared and signed by designers with appropriate licenses, which they performed technical control of the individual parts of the project, a final report is signed by a representative of the legal entity or entrepreneur.

The project for a building permit made under the regulations of other countries is subject to technical inspection by which the compliance of these documents with the law and other regulations, standards, technical and quality norms.

A company or other legal entity or entrepreneur that performs development and control of technical documentation, or who is a contractor, acting professional supervision or technical inspection must be insured against liability for damage that may be caused by the other, or a third party.

Obtaining the necessary construction documentation

Obtaining the necessary documentation for the construction is demanding and responsible job and requires knowledge of the field of investment cheeses. Activities will include three phases: preparation for construction, construction of the facility and obtain occupancy permit.

INTEGRATED PROCEDURE

PHASE I: PREPARATION FOR CONSTRUCTION

  1. Location Conditions
  2. Building permit

PHASE II: CONSTRUCTION

  1. Papers
  2. The statement of completion of the foundation
  3. Declaration on the completion of the facility in a constructive sense

PHASE III: USE PERMIT

  1. Request for issuing permits use
  2. Registration in the cadastre
Technical control of documentation

The project for the building permit is subject to technical control. The technical control of project for the building permit may be performed by a company or other legal entity or entrepreneur who meet the requirements for technical documentation required by law and determined by the investor

Technical control of the project for the building permit shall include in particular verification of: compliance with all terms and conditions contained in the Permit, the law and other regulations, technical norms, standards and quality, as well as the mutual compatibility of all parts of the technical documentation; compliance of the project with the results of previous research (Previous work); assessment of the appropriate basis for foundation of structures; checking the validity and accuracy of technical and technological solutions and solutions for construction of structures; stability and security; Rationality of the projected material; the impact on the environment and neighboring buildings.

About completed technical inspection report shall be prepared and signed by designers with appropriate licenses, which they performed technical control of the individual parts of the project, a final report is signed by a representative of the legal entity or entrepreneur.

The project for a building permit made under the regulations of other countries is subject to technical inspection by which the compliance of these documents with the law and other regulations, standards, technical and quality norms.

A company or other legal entity or entrepreneur that performs development and control of technical documentation, or who is a contractor, acting professional supervision or technical inspection must be insured against liability for damage that may be caused by the other, or a third party.

Technical inspection of facilities

Technical inspection of the facility shall be made after the completion of construction of the facility, phase or part of the building for the facility for which the building permit was issued, or a decision under Article 145 of the Law, the investor intends to apply to the competent authority for issuing the use permit.

Technical inspection may be conducted in parallel with the execution of the works.

Technical inspection may be carried out:

  1. for the entire facility
  2. according to stages of construction the facility, for facilities for which the construction permit foresees the construction phase
  3. for parts of the building, which not building permit constitute a special stage, and which in the opinion of the Commission, or in accordance with the technical documentation represent technical and technological whole and as such can be used independently.

Technical inspection of the facility include:

  1. verifying full technical and other documentation for the construction of the facility, or the execution of works
  2. control of compliance of performed works with building permit, technical documentation based on which the facility was constructed, as well as technical regulations and standards relating to certain types of work and materials, equipment and installations.
Design all types of buildings

Teams of engineers, in cooperation with partners, specialized in making all kinds of projects:

  • Design of business facilities for different purposes
  • Designing residential and residential and commercial buildings
  • Design of industrial buildings and facilities

Design object consists in making all kinds of technical documentation according to specific needs, including:

  1. General Project (GP)
  2. Conceptual design (CD)
  3. Project for building permit (PBP)
  4. Project execution (PE)
  5. As-built facility (ABF)

Designing is approached after obtaining location conditions. Locational conditions contain all the urban, technical and other conditions and data necessary for the preliminary design (PD) and Project for building permit (PBP) and the project for execution (PE) and information about:

  1. Number and area of cadastral plots, except for the line infrastructure facilities and antenna poles
  2. Name of the planning document, or planning document and the urban project on the basis of which are issued location requirements and construction rules for a zone or a group in which the respective grounds
  3. Conditions for connection to utility, transportation and other infrastructure
  4. Data on existing buildings on the plot to be removed prior to construction
  5. Other conditions in accordance with the law.
Professional supervision

Regulations on the content and keeping technical supervision shall be specified by the content and method of professional supervision during the construction of the facility or works for which the building permit was issued

Professional supervision refers to: the preparatory work; building and construction work; installation of installations, facilities and equipment; other works carried out during the construction of the facility.

Engineering, evaluation and project management

Engineering, evaluation and project management is the integration of all related activities in the construction process, monitoring of implementation and effects of exploitation and directing activities

Activities of the initial research, production feasibility studies, sketches and technical solutions and project documentation to technical acceptance of the object and obtain the occupancy permit, the investor may entrust a team of experienced engineers and experts in the engineering system. This way of conducting and investment management has advantages in correct analysis and quality and rational construction. Unified monitoring the implementation of the project reduces the possibility of error.